Two questions come up on almost every commercial fence bid in the Chicago area: is the sub union, and can they do prevailing wage? The terms often get used as if they mean the same thing, but they are two different requirements that come from two different places. One is set by law. The other is set by contract.

Mixing them up can mean inviting a sub who cannot work the job, or chasing certified payroll after award. Below is a plain-language breakdown of union vs. prevailing wage from a fence contractor that works under both every week. For the short version of how we handle labor requirements, our union and bid compliance page lays out our standards and the paperwork that comes with them.

What Prevailing Wage Means on Illinois Public Projects

Prevailing wage is a minimum pay standard required by law on certain construction projects. In Illinois, it comes from the Prevailing Wage Act, and it applies to public works. Here is what that means in practice for a fence package.

Which Projects Are Covered

The law covers fixed works built or demolished by a public body, or paid for in whole or in part with public funds. That includes a lot of the fence work we see on municipal facilities, parks, and public infrastructure. Our municipal and park district fencing work is almost always prevailing wage. Federally funded jobs can bring federal wage rules into the picture as well, so the bid documents are always the first place to check.

Who Sets the Rates

The Illinois Department of Labor determines prevailing rates by trade and by county. Each rate includes the hourly wage plus benefits, and rates for overtime and holidays are spelled out too. The department publishes a full update every year and can revise rates during the year, so the rate that applied on your last public job may not be the rate that applies today.

What It Requires on Paper

Contractors and subcontractors on covered projects must keep detailed payroll records and file certified payroll each month through the state’s online portal. Each report shows who worked, what classification they worked under, how many hours they put in, and what they were paid in wages and benefits. Late or missing filings can create real problems for everyone on the project, which is why GCs pay close attention to which subs have done this before.

What “Union” Means When a Fence Subcontractor Says It

A union subcontractor is signatory to a collective bargaining agreement with a trade union. That agreement sets the wages, benefit contributions, and work rules for the crews. Health, pension, and training contributions are paid on every hour worked, not just on certain projects. In the Chicago area, union fence crews typically work under the ironworkers.

Pro Fence is signatory with Ironworkers Local 63, Local 444, and Local 498. We went union and incorporated in 2009 for a simple reason: the commercial work we wanted to do in this market required it, and that is still true today.

Here is the part that trips people up. Union status is usually not a legal requirement. It is a contract requirement. An owner, a developer, or a GC can specify that a project is union-only, and a project labor agreement can require the same thing across every trade on the site. When a job is written that way, only signatory contractors can bid it, no matter how qualified a non-union shop might be.

Union-only requirements show up on both public and private work. A large private development, a corporate campus, or a mission-critical facility can be union-only even though no public money is involved and the prevailing wage law never applies. On those jobs, the question is not what workers are paid. The question is whether the contractor is signatory at all. That is why the union question often comes first on a bid invitation, before anyone looks at the fence spec or the drawings.

Union vs. Prevailing Wage: The Key Differences Side by Side

When you put the two requirements next to each other, the differences come down to where each one comes from and who can meet it.

  • Where it comes from: Prevailing wage is set by state law, and in some cases federal law. Union-only is set by the owner, the GC, or a project labor agreement in the contract documents.
  • Which projects it covers: Prevailing wage applies to public works and publicly funded construction. Union-only can apply to public or private work, including large private projects like data center security fencing packages.
  • Who can comply: Any contractor can meet prevailing wage by paying the published rates for every worker on the job. Only signatory contractors can meet a union-only requirement.
  • How pay is set: Prevailing wage rates are published by the state by trade and county. Union wages and benefits are set by the labor agreement and change when the agreement does.
  • What it requires on paper: Prevailing wage requires monthly certified payroll filed with the state. Union projects require compliance with the labor agreement, and public union work usually requires certified payroll too.
  • What happens if it is missed: A prevailing wage problem is a legal compliance issue. A union-only problem usually means the sub never should have been awarded the work.

The short version: prevailing wage is about the pay floor, and union-only is about who is allowed on the job. Some projects carry both requirements at once, which is common on larger public work in the Chicago area.

Does a Union Fence Sub Satisfy Prevailing Wage?

In most cases, yes. In the Chicago area, prevailing wage rates for the building trades are typically based on the wages and benefits paid under the local union agreements. A union shop already pays at that level, so it generally meets or exceeds the prevailing rate without changing anything about how it runs a job.

That is why union is often described as the higher standard. A union sub can bid union-only work and prevailing wage work alike. A non-union sub can bid prevailing wage work by paying the published rates and filing certified payroll, but it cannot bid a project that is specified union-only. For a GC building a bid list, a union fence sub covers both scenarios with one invitation.

It also simplifies the work after award. Our crews are paid the same way whether they are on a park district backstop, a perimeter around a distribution center, or the solar farm fence crews working utility-scale sites across the Midwest. Certified payroll is part of our normal process, so it does not become a special request that slows down a pay application.

One caution applies every time. Always confirm the current published rates for the county and trade on your project, and always read the project documents. Rates are updated, classifications matter, and the contract controls. Our estimators review those requirements on every bid that comes through our Wheeling, IL office, so labor costs are built into the number from the start instead of showing up as a change order later.

Common Questions About Union and Prevailing Wage Fence Work

Is prevailing wage the same as union wage?

No. Prevailing wage is a legal minimum on covered public projects. Union wages are set by a labor agreement. In the Chicago area the two are often closely aligned, but they are not the same requirement.

Can a non-union contractor work on a prevailing wage job?

Yes, as long as it pays the published rates and files certified payroll. It cannot bid a project that is specified union-only.

Does temporary fence on a public job need prevailing wage?

Usually, yes. If the project is covered, the labor to install, move, and remove temporary fence is typically covered too. Our temporary construction fencing crews work under the same signatory agreement as our permanent crews, and labor requirements are one of the factors covered in our guide to what drives temporary fence rental cost.

What paperwork should a fence sub provide on these jobs?

Expect certified payroll on the required schedule, proof of signatory status on union-only work, certificates of insurance, submittals, and crew background checks when the site calls for them.

Who publishes prevailing wage rates in Illinois?

The Illinois Department of Labor publishes rates by trade and county. The rates are posted publicly, so a GC or owner can check the current numbers for any county before a bid goes out or a pay application is reviewed.

What is a project labor agreement?

A project labor agreement is a contract that sets labor terms for every trade on a specific project. Many of these agreements require union labor, which is one of the most common reasons a job ends up specified union-only even when the owner is private.

Union vs. Prevailing Wage at a Glance

Before you send out your next fence bid invitation, here is the checklist version of everything above:

  • Prevailing wage is a legal pay floor on public works and publicly funded projects.
  • Union-only is a contract requirement that only signatory contractors can meet, on public or private work.
  • A union fence sub generally meets prevailing wage, so it can bid both.
  • A non-union sub can bid prevailing wage work, but not union-only work.
  • Confirm the current rates for your county and trade, and read the project documents.
  • Ask every sub about certified payroll, signatory status, COIs, and the submittal package, like the detailed security fence submittals we prepare on perimeter jobs.

Each of these points takes a minute to confirm on a phone call or in a bid form. Getting these answers before award saves your project team from follow-up calls, late filings, and rebids. This article is general information, not legal advice. Confirm requirements against your project documents and current Illinois Department of Labor guidance.

Bid Your Next Union or Prevailing Wage Fence Package With Pro Fence

We have been a union signatory since 2009, and we bid union-only, prevailing wage, and private work every week. Certified payroll, CAD shop drawings, product data sheets, COIs, and crew background checks are part of how we run every job, so your team is not stuck chasing paperwork.

Send us your plans and specs, and our estimators will get you a clear number, usually in about three to five business days. When you are ready, request a bid and tell us about the labor requirements on your project. If the job is union-only, prevailing wage, or both, let us know up front so the number reflects it. We will take it from there.

Fence Know-How From the People Who Bid It

Our estimators write about what they see every day: submittal packages, union and prevailing wage rules, temporary fence pricing, and what really drives a commercial bid. Have a project you want priced instead?

Contact Us Today
Like this article? Spread the word!
Related Posts

What Goes Into a Commercial Fence Submittal Package

What goes into a commercial fence submittal package? Shop drawings, data sheets,…

Temporary Fence Rental Cost: What Drives the Price on a Chicago Job

What drives temporary fence rental cost? Footage, 6 ft vs. 8 ft, stands vs. posts, rental…